• Why the move to the North American Charging Standard (NACS) made the DC fast charging cable harder to build, not easier

  • Megawatt charging at 1,500 A means chilled liquid inside the cable. What a liquid-cooled cable actually looks like

  • Cable in conduit cuts 25 to 30% off total cost, per Southwire’s calculations, and has paid for itself before the install is done

  • Why “aluminum now, copper later” stopped working once site expansions started doubling in size

Somewhere in the US there’s an EV charging site where a Southwire field engineer pulled the wire out of its conduit, months after the site went live, and found tire tracks on it. Somebody had driven over the cable while it lay on the ground waiting to be pulled in. At another site, debris that fell into the conduit wore through the jackets until hot shorted to neutral and the dispenser went dark. Nobody designs for that. But as Joe Fawcett tells it, nobody should be surprised by it either, because the conventional way of building the underground half of a charging site hands a coil of taped-up wire to the jobsite and hopes.

Fawcett is a Business Development Sales Manager for eMobility Infrastructure Solutions at Southwire, the Georgia wire and cable maker, and his half of the site runs from the utility transformer to the dispenser: medium-voltage feeders, duct banks and the company’s cable-in-conduit (CIC) product, which arrives on one reel with the conductors already inside the HDPE. His colleague Kevin Wahl, Lead Consulting Engineer in Southwire® CableTechSupport™ Services group, supports the other half: the charging cable that hangs off the dispenser and gets twisted, kinked and run over by the public. Southwire told Charged in a 2025 interview that roughly 95% of its EV charging cables are built to project-specific requirements, which gives Wahl a wide view of what goes wrong.

The two halves share a problem, which is heat, and a trend, which is more current through less conductor. At the dispenser that means splitting two large conductors into four smaller ones run in parallel, and at megawatt power levels, around 1,500 A, giving up on passive cooling and instead running a chilled liquid through the cable itself. Underground it means duct banks packed without spacing, concrete whose thermal resistivity changes from one supplier to the next, and site owners who used to plan on swapping aluminum for copper when they needed more capacity, only to find the next expansion doubles the size of the station instead.

Fawcett’s number for CIC is a 25 to 30% savings on total cost, more on labor alone. His payback period: “By the time we’re done installing it, you’ve paid back the investment in it.”

Charged spoke with Fawcett and Wahl about what five years of charging-cable design has changed, why the move to NACS makes the engineering harder, what a liquid-cooled cable actually looks like inside, the part of the durability problem no cable design can fully solve and why a fleet depot’s demand curve looks nothing like a highway charging stop’s.

Looking at a charging site from the utility connection to the vehicle, what are the biggest cable engineering challenges, and how have they changed over the last five years?

Joe Fawcett: I’ll go first and Kevin can pick up at the dispensers. The scale of these charging sites is increasing, particularly as we move toward fleet charging. So often sites require a separate service and a separate transformer from the utility, and medium-voltage cables, which are going to have longer lead times than your 600 V cables. So, it really comes down to being right in the planning process. The transformers themselves have quite a long lead-time right now. But what we’re talking to folks about is what kind of standardization you can put around your medium-voltage cable design. Everybody’s looking for something a little bit different, but the more standard we can be on our configurations, the easier it’s going to be to create stock and fill those orders.

Kevin Wahl: From the dispenser, the electric vehicle supply equipment (EVSE), to the actual vehicle, compared to five years ago there are a lot of the same challenges. That’s making the cable lighter, smaller, more flexible, easier to handle and still durable. Because you have to think, people aren’t treating these with the most respect, love and care, as you would maybe something that’s your own, especially with public charging. They’re getting a lot of abuse.

Something that may be a little different from five years ago is the connector. Five years ago, they were standardized on the SAE J1772 Type 1 connector, or CCS, the Combined Charging System, for fast charging. Tesla had their own, which they call NACS, the North American Charging Standard. Well, over the past five years the Tesla Superchargers built out much more quickly than a lot of the others, and all the other auto manufacturers, Ford, Chevrolet, all these guys, said, hey, we’re going to move to NACS. It’s a little bit smaller of a connector, driving a slightly different cable configuration, different signal wires in there, making it an even smaller cable, really pushing the limits of what we’re able to do on the cable side. That’s one of the largest challenges.

On the government side, a lot of regulations may still require that new charging sites still have CCS1 or the Type 1 connectors, but the majority of new cars moving forward are going to standardize on NACS. So, regulation still has some places to catch up.

People aren’t treating these with the most respect, love and care, as you would maybe something that’s your own, especially with public charging. They’re getting a lot of abuse.

What changes in the cable as you move up to DC fast charging and higher current?

Wahl: The biggest change you see on cable design is larger copper conductors, for sure, to carry all that power. But when you start to get very large, you start to see advantages in splitting the wires up. So instead of having two massive wires going from the supply equipment to the vehicle, splitting it into four smaller wires and running them in parallel can actually yield a physically smaller cable, and also a little more flexible, because smaller copper wires are easier to bend. At this point the majority of the weight is coming from the copper wires themselves and not really from the other components, like the polymers or the fillers.

When you go even higher than that, you have megawatt charging. A lot of this is still really in the trial phase. They’re doing it with large buses or tractor trailers, trucks, things like that, at very high power, 1,500 A or so. At that point you really are looking at liquid cooling. It’s a much more complex design and a different site design, because you need chillers. But now you’re looking at shrinking the copper in the cable and running at higher ampacities because you’re actively cooling it. You can do that for megawatt charging, and we’re actually starting to see a few DC fast charging EVSEs utilize this technology as well, so they can have a smaller cable but still charge those vehicles much faster.

At some point more copper becomes impractical. What else goes into a liquid-cooled cable?

Wahl: How is it being cooled? Is it a water-glycol mixture? Is it some sort of dielectric oil? These different coolants have different heat capacities. The way the chillers move the liquid through the cable can alter how efficient they are at cooling: different flow rates, whether it’s direct cooling or indirect cooling. By that I mean we have some designs where the copper is immersed in a dielectric oil and directly cooled, or indirect cooling, where there are liquid tubes in there and the insulated copper wires surround them.

For the cooling path, you may have it go over the copper conductors and back down a return tube, or it may go up one conductor and back on another in a parallel circuit. On the return, that liquid isn’t as cool, because it was already warmed up on the way out by the first conductor. So, there are different cable designs you have to work on to make a cable that can output the power they’re looking for, hit the charge cycle time they’re looking for and work with the chilling system they have in their supply equipment.

What are the biggest real-world failure modes, and how do you design for them?

Wahl: The cable management system is a big part of it. When we’re talking about these large, heavy cables, you can’t just hold them up by a little ring like you may have seen at the gas station. People use that at a lot of EV charging sites, because the technology is around, it’s available, people are familiar with it. But if you just hold the cable at that one little point, because it’s so heavy, it’s going to start drooping and it’s going to start violating its own minimum bend radius. You start seeing kinking in the copper, ripples in the jacket, a lot of degradation.

On top of that, you might see people constantly twisting it. The first person grabs the cable out of the EVSE and turns to their left to put it in the vehicle. The next person grabs it and turns to their left again. You’re constantly winding it. So, you have to design the EV cable to withstand that abuse. We utilize what’s called neutralization in the cabling process, this is where we eliminate any potential back-twist in the cable, so it has less memory of being wound around. This makes it so you don’t get what’s known as corkscrewing. Sometimes you see a cable that looks real ratty, like a corkscrew, and that’s usually because it’s a non-neutralized cable, something common on cheaper or more economical cable products.

But the management system is not something for which we can totally design. We can make recommendations. There’s a new NEMA standard, NEMA EVSE 40007, and I was part of that committee, where we came out with EV charging cable management system guidelines and best practices. Having something like the larger U-shape support, or an automated system that pulls the cable back in, helps manage the weight so the cable’s not lying on the ground for somebody to run over it, step on it or trip on it.

If you just hold the cable at that one little point, because it’s so heavy, it’s going to start drooping and it’s going to start violating its own minimum bend radius.

How much has the move to standardized connectors changed the cable engineering itself?

Wahl: Again, it’s really just trying to make it smaller. If you look at the NACS connector versus the old CCS1 connector, it’s way smaller. The CCS1 had the AC on top and the two large DC pins on the bottom, so you had a lot of room in the connector to do your terminations. You could use a larger cable because it’s a larger connector, but it was a little unwieldy. If you think about somebody’s 67-year-old grandma who just wants to go charge her car, a big cable like that can be a little hard to maneuver and connect.

NACS does allow for a lighter or smaller cable because it uses the same pins for DC and AC, and it can tell what’s connected in. But then again, you’re really forcing a lot out of the thinnest cables. Some of those connectors, especially the large DC fast charging ones, can get quite heavy, so the heavy connector on the end could be putting a lot of stress on the cable where it connects to the vehicle. You want to make sure you’re using the right grommets, strain reliefs, things like that, and by using flexible conductors so you can actually terminate inside, because it’s a very small space to work with.

Another thing is you have all these wires in very close proximity to each other, and when you go to the higher frequencies with DC fast charging, you can generate a lot of noise. So, you start needing to shield those signal wires, the control pilot, CP, and the proximity pilot, PP, the pins that communicate with the car. As well as any other signal, communication, or temperature sensing wires in the cable. Now you start looking at braid shields, because that offers increased flexibility. It comes with increased cost, so there are design tradeoffs. You’re protecting from the electrical noise, but you’re adding a lot of manufacturing steps and complexity. So, it’s good to look at the application and say, hey, can we get away with a foil shield and a drain wire? That makes the cabling process a lot easier and helps reduce cost, because there’s a lot less copper compared to a braid shield design.

Southwire’s site mentions Cable-in-Conduit. What problem is that solving compared with installing conduit and pulling conductors the conventional way?

Fawcett: What we’re talking about now is the underground stuff, the infrastructure that’s feeding from the transformer out to the dispenser. Cable-in-Conduit is a combined product. We take an HDPE conduit, and as we’re manufacturing it, we place the cable inside. A typical installation would glue PVC conduit together in the trench, then come back later and pull a rope in as a separate operation and then use that rope to pull in wires as a subsequent operation.

So, it’s trying to address a couple of things. One is material handling. We’re sending you one reel that has the wire already in the conduit, as opposed to separate reels of wire and usually a trailer with all the conduit and the fittings and the glue. Another thing it addresses is potential cable damage. A lot of these jobs are happening in a parking lot. There might be gravel, glass, and broken bottles lying around. A lot of these runs are shorter, so instead of arriving on reels, sometimes those wires just show up coiled up and taped together, and the first step is to cut the tape and roll it out on the ground. If that ground has any debris on it, there’s a good likelihood we damage that cable. Then when you’re physically pulling that wire into the conduit, it can rub against the edge of the conduit or the bus in the bottom of the switchgear and sustain jacket damage, which might not fail immediately but might be a problem down the road.

We’ve seen that happen on a number of jobs, where folks have come back a year, six months after a site’s been active. On one site, one of Kevin’s colleagues went out there, and when they pulled the wire out there were tire tracks on it, because while it was lying on the ground somebody drove over it. We had another case where the wire had been damaged and a piece of something had fallen into the conduit, and over time it wore through the jackets and shorted out from hot to neutral. The dispenser wasn’t working and they had to replace the cable. So, by eliminating that wire-pulling operation, you remove the risk of what can happen to that cable being installed the conventional way.

That feeds into the labor savings. By eliminating the wire-pulling process, we’re typically going to say you save certainly 25 to 30% of the total cost, and even more on labor. You’re paying a little bit of a premium for the product, because we’re putting that wire in the conduit for you, but you more than make up for it in the time saved. Somebody asked me, what’s the payback period on the increased cost? By the time we’re done installing it, you’ve paid back the investment in it.

When might CIC not be the right choice? If I have really short runs, it might not be. If I need to transition from underground to above ground, it might not be, because HDPE conduit cannot be run exposed. It either needs to be buried or encased in concrete. But any time we have these longer, more repetitive runs, it’s going to make a ton of savings on the labor end. We have a labor savings calculator on our website where they can do some what-ifs: what would it look like with PVC versus using CIC?

Somebody asked me, what’s the payback period on the increased cost? By the time we’re done installing it, you’ve paid back the investment in it.

As charging sites get larger and power levels increase, what should engineers be thinking about differently in terms of thermal modeling and capacity?

Fawcett: Higher amperage, and the same as with the EVSE cables, the challenge is heat. When I see a lot of installations, typically you’re digging your trench, laying these cables or conduits in the trench and pulling the wires in. More or less, you’re building a duct bank, but a lot of folks aren’t treating these EV sites as that. They’re just putting the conduits or cables on top of each other without maintaining spacing. The engineers typically account for that, and there’ll be diagrams on a plan, but it’s not necessarily being enforced on the job site. When we pack these cables and conduits close together, they can’t dissipate the heat. And that’s going to vary depending on the thermal resistivity of the soil and some other factors.

Wahl: If you’re putting cable in a duct bank or in conduit in concrete, you have to go to your concrete supplier and figure out what their rho is. Not all concrete is made the same. Just because you did calculations for the concrete on one site, it may be different because you have a different concrete supplier on the other side of town.

A lot of times people are saying, I’m going to buy aluminum today because it’s cheaper, and then in the future I can upgrade to copper, same sizing, same spacing, and get a little more ampacity. To get the same ampacity as copper, with aluminum you typically have to go about two-gauge sizes up. But now what we’re seeing is people aren’t even doing that, because they’re maxing these stations out. When they go to expand, they’re not adding one EVSE or increasing the power a little. They’re doubling the size of it. And you can’t deliver that kind of power by just changing aluminum to copper.

So, we’re seeing a lot of empty duct banks being worked in from the beginning, or site planning so that maybe they’re only ripping up the pavement in one section and the rest could be added on a side where they just dig up some dirt. They’re utilizing technology like cable in conduit and directional boring. Where you can bore right underneath an existing sidewalk or paved surface without disturbing it, pull the cable in conduit in right behind it, and you’re done.

When it comes to thermal modeling on the cable side, most people are still going with the UL qualifications, or they might use an engineering firm or another field evaluation body. They qualify certain EVSEs for what they call boost modes. A boost mode might say you’re going to charge at over the rated capacity of the charging cable, but you can only do it for maybe five minutes, and then it has to stay at the max or lower for maybe 30 minutes, an hour to cool down, before it can boost again. There’s also what they call a T-rise, or temperature rise, test that UL requires for qualifying EVSEs and cable assemblies. You can use that to figure out, I should make a cable this big with these size wires, then make the cable, qualify it and get the boost modes you were designing for initially.

More or less, you’re building a duct bank, but a lot of folks aren’t treating these EV sites as that.

Five years out, beyond megawatt charging, what changes will have the biggest impact on what you do?

Fawcett: What we’re seeing is much more of a trend toward fleet charging, delivery vehicles. The charging network is by no means fully built out, but certain areas, California, Texas, Florida, the Northeast, have done a really good job of getting charging along your routes. What we’re now seeing is the fleets really coming on strong, because financially it makes sense, even with some of the incentives up in the air. The maintenance on the vehicles is a lot less. It just pencils out for these large delivery companies.

But the usage looks different. If I go from California to Vegas, I pass however many Supercharger sites, and cars are stopping at their convenience. At a fleet charging site, these trucks are running out all day and they all come back to the depot at about the same time, looking to charge at the same time. From our end, the site itself is going to require a much higher ampacity to deliver that all at once. The demand usage is going to be a bit different model than we might typically be associated with. We’re also seeing a lot of sites put in battery storage. If those fleet vehicles are out during the day, that capacity could be charging up a battery at the site, so when the vehicles return, you’re leveling out the energy. It’s almost like energy arbitrage. But on our end, these projects require more and larger cables, and projects that might not have required a medium-voltage transformer now do.

Wahl: Joe hit the nail on the head for most of it. The trends we have seen in the past few years are going to continue. They’re going to want smaller, lighter, more flexible, more power. Liquid cooling is a great one we’ve been looking at, especially with DC fast charging. And as these sites continue to build out, you start to see additional types of wire. You see PV wire for solar panels on site. You have battery storage on site, so now you have those hookup wires between the batteries. And a great one Joe mentioned is time of use. If you have fleet vehicles but can only charge three at a time, and all 50 are plugged in, you can stagger which ones are on until they’re fully charged, because the grid can only handle so much, and the grid is already really backed up. So now you’re talking about advanced control, data, analytics, a lot of information wires and signaling cables also being run at these sites.

The impact on the cable design is kind of the same, but the amount of cable being used is just increasing exponentially.

So, the impact on the cable design is kind of the same, but the amount of cable being used is just increasing exponentially. And it’s not going away. We’ve definitely seen a hit to the EV market in the past few years. Things have calmed down, but where it’s gone strong, it’s gotten stronger. A sign of a good, healthy market is that it’s continuing even in a downturn or a dip. People are building sites out, because you need charging available everywhere, to all different people, no matter where you are. Not just on the highways and major routes, but downtown, near the shopping center, in rural areas. There’s just a lot going on.

Southwire’s Charged webinar on cable in conduit is available to watch on demand, and Wahl’s companion whitepaper on cable pulling and CIC alternatives is here.


Discover more from ECO Charging Stations

Subscribe to get the latest posts sent to your email.

Categories: Uncategorized