
The Austrian Torrent and Avalanche Control Centre has deployed a Liebherr-developed battery energy storage system to power the cranes, offices, and equipment used in the construction of this year’s consolidation barrier – a critical piece of infrastructure designed to keep Austrians safe from avalanches and landslides this winter.
Here’s how it’s going.
Discover more from ECO Charging Stations
Subscribe to get the latest posts sent to your email.
0 Comments